Wellington Scoop
Network

E-Mail '$15m spent on preparations for strengthening the Town Hall' To A Friend

Email a copy of '$15m spent on preparations for strengthening the Town Hall' to a friend

* Required Field






Separate multiple entries with a comma. Maximum 5 entries.



Separate multiple entries with a comma. Maximum 5 entries.


E-Mail Image Verification

Loading ... Loading ...

3 comments:

  1. Lindsay, 21. April 2019, 10:27

    Good to know that the major contract, with Naylor Love, was signed three weeks ago. So the real strengthening work is starting … at last.

     
  2. CC, 21. April 2019, 12:47

    Willis Bond, who have begun building the Convention Centre for the city council, are incorporating base isolation in their new Victoria Lane Apartments.

     
  3. Harry M, 22. April 2019, 6:27

    It wasn’t “base isolated” before and during the K Quake. The Council should have left it open and let people use it.