Wellington Scoop
Network

E-Mail 'Questions about late plan to extend Transmission Gully merge lane at Linden' To A Friend

Email a copy of 'Questions about late plan to extend Transmission Gully merge lane at Linden' to a friend

* Required Field






Separate multiple entries with a comma. Maximum 5 entries.



Separate multiple entries with a comma. Maximum 5 entries.


E-Mail Image Verification

Loading ... Loading ...

4 comments:

  1. Commuter, 19. November 2020, 20:42

    New Zealand. World leaders at badly designed roading projects.

     
  2. Dave B (Wellington), 20. November 2020, 15:18

    New Zealand. World foot-draggers at transitioning away from excessive dependence on road transport.

     
  3. Chris Horne, 20. November 2020, 16:13

    Has anyone told Waka Kotahi/NZ Transport Agency that Covid-19 has resulted in many people working from home, rather than driving to work? Might that not greatly reduce the number of people driving to work from the Kapiti Coast? Might that not render the proposed 650m slip lane a waste of time, effort and money? Or is it simply a job-creation scheme?

     
  4. Rob, 20. November 2020, 19:05

    Reduce commuter road traffic from Otaki and north coming down to catch the train from Waikanae to Wellington. Electrify the line to Otaki ASAP. It will also reduce congestion and reduce fuel consumption. Easy to reduce vehicle usage. Electrification Waikanae North is top of the list.