E-Mail 'From $90m to $120m - and the perils of a three-lane tunnel' To A Friend

Email a copy of 'From $90m to $120m - and the perils of a three-lane tunnel' to a friend

* Required Field






Separate multiple entries with a comma. Maximum 5 entries.



Separate multiple entries with a comma. Maximum 5 entries.


E-Mail Image Verification

Loading ... Loading ...
 

1 comment:

  1. Traveller, 6. June 2014, 20:36

    The enormous cost increase points to a similar financial blowout if the flyover is allowed. The NZTA has a poor track record of effective budget management in central Wellington.

     

Write a comment: